18. What is the thing that might make you happy at your
work place?
Answer Posted / kishor korpade
Completing the work as per schedule.
| Is This Answer Correct ? | 7 Yes | 1 No |
Post New Answer View All Answers
Process of pcc in wateredug
How much Tolerance factors like 1. brick work 2.plaster 3.painting 4.floor tiling 5.wall tiling 6.shuttering 7.concreting 8.steel
what's the formula for calculate pcc for matt(45mm aggregate)?
Pile height is 4.3m. 2nos. under reammer. bulb nose is 75mm and height is 400mm. pile dia is 375mm and overall dia 940mm.pls. help to calculate concrete in pile and bulbs separately. What is formula for bulb volume calculation ?
Can a wave happen in the middle of the ocean like in the movie poseidon 2006?
WHERE CAN I GET THE PREVIOUS QUESTION PAPERS OF APGENCO FOR THE THE POST OF Tr.ASSISTANT ENGINEER(CIVIL)
Explain the importance of moment of inertia?
Who built the sears tower?
Before casting a basement roof slab which is connected with retaining wall surcharge load (i.e. sand or earth filling) outside the retaining wall is prohibited because of––
does a b.tech civil engineer fresher supposed to know how to design rcc structure?
150mm bricks size how many use 4.14 m3
cement mortor 1:5 for 30 m2 12 mm tk plastering so how to calcualte its rate
I have to design brick column and footing (note: without any reinforcement). Can somebody post me the design or suggest a book where i could possibly find the design? Plz help very urgent
how to calculate 1:5:8 ratio concrete cement, sand, metal and water please give me brief calculation
what is pqc