What is the ratio of cement, sand, aggregate of mix M25
Answer Posted / sjtbehera
normally as per is code 456-2000 M25 ratio is - 1:1:2
| Is This Answer Correct ? | 152 Yes | 10 No |
Post New Answer View All Answers
any book or article on pumped concrete.
1. 1. The mass of a chunk of moist soil is 34 Kg and its volume is 0.012 cu. Meter. After drying in an oven, the mass reduces to 14.25 Kg. Determine the water content, the density of moist soil, the dry density, void ratio, porosity and degree of saturation. Take G = 3.25
5. Do you feel that your present employer estimates your full work potential? Are they pleased with your work performance?
What is meant by solid geometry?
What are the advantages of cad software?
What is braced excavation all about?
. Write a C program to perform following functions:- a. Declare one integer variable of all the storage classes. b. Print all the variables without assigning any values in tabular format. a. The tabular format must contain the variable name, type, storage class and printed value on the screen in RED color.
Where is the worlds longest elevator and how long is it?
I want to know the relevant IS codes of practice which deals with different testings of cement-sand mortar (nominal mix)that is being normally used for brick work or plaster work in the construction work.
What is the mix propotion of M10,M15,M20,M25,M30,M40,M50.M60 cement content,aggrigate,sand and water ratio.
If we have the center line of the Finnish road level and we want to know what level of pay would have offset the Lhs and Rhus RHS 1,2.5,5 1,2.5,5 m.
what is raft foundation
what is the construction cost for per cft of multistorryed building in kolkata?
Gave a cantilever beam with 3 legs.Told to draw the bending moment diagrams, axial force diagrams and shear force diagrams.From BMD he asked to show how the reinforcement will be provided on the tension side.
What is labor and material payment bond?