Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

What is the Specific gravity of cement?Water?

Answer Posted / nadim

1506 kg/cum

Is This Answer Correct ?    14 Yes 22 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

How to find CN by using arcgis 9.3?

2418


TO CONSTRUCT A 1800 SQFT CAPACITY UNDERGROUND WATER TANK HOW MUCH CUFT CONCRETE IS REQUIRED AND HOW MUCH REINFORCEMENT IS REQUIRED. FOR COSTING

2513


.5Ast

1787


Can inverted beams used in pipes during construction?

1340


What is Gsb tollens ?

2005


what is the cost differene of a same structure when it is constructed with brick masonary, and when it is constructed with concrete as a frame structure.????????

1940


How many litres of water used for curing of 1000sqft of slav

1553


quantity of material needed for rubble stone masonry for 1:4 and 1:6

1838


I have certain queries, please help to solve. a) length of pile bore is 4m.excavation quantity will be area * length where area will be pi/4 * dia*dia. Is this right? b) It is a single reamed pile of 300m dia and reamed dia is 750mm. can any body help me to calculate excavated quantity of this bulb(reamed section),, concrete quantity in bulb with showing the formulas to be used?

2089


What is Architect-Prepared Contract?

1186


How will drive weight formula for circular cylinder steel bar in kg/ m please step by step drive?

2212


Can anyone suggest how to determine scheduling of reinforcement of floor beams from Staad model,other than clicking each beam respectively 7 noting down the values ?

2133


How to calculate(Thumb rule) the consumption of steel per cubic meter for different concrete members. 

3352


we have a bore well 275 depth & water is deliver at distance of 1000 feet from the borewell here iam not include the distance of depth and the deliver water horizontally at our reserviour tank on ground level

2630


what is the formula to find the sttel (bar)length in beam having bent up at l/4 t 45 degree & 60 degree.

2609