Answer Posted / dino
through primary cost elements we can post from fi to
co.While doing any posting in FB50 u will have an option to
fill up the order,costcentre.Hence data flows via a primary
cost element
| Is This Answer Correct ? | 2 Yes | 0 No |
Post New Answer View All Answers
Difference between PP and PI.
Question related to Production order status or status profile?
Integration between PP and MM Module.
What is the role of an administrator in pa?
What is plm (product lifecycle management) in sap pp and what is the use?
What is the purpose of using capacity planning?
Different types of Object Dependencies.
List out the basic procedure for dispatching operations in capacity leveling?
How many levels of Flexible Planning are there?
Explain what is the need of mrp list if the stock requirement list is already given?
Define mrp controller
What is Individual and collective requirements and differecne between them in MTO scenario?
What are the three 'mrp procedures'?
Explain Planning file entry.
What does a PP Consultant do in his/her real time?