Answer Posted / dino
through primary cost elements we can post from fi to
co.While doing any posting in FB50 u will have an option to
fill up the order,costcentre.Hence data flows via a primary
cost element
Is This Answer Correct ? | 2 Yes | 0 No |
Post New Answer View All Answers
What is mrp controller means?
Can we have more than 6 standard values in standard value key?
What are all the steps involved in Variant Configuration?
What do you mean by pooled capacity?
list the important tables used in pp.
Mention what is the difference between stock transport order and stock transfer order?
Why is work scheduling required for semi finished and finished products?
a company needs 12 standard values. how it can be maintained?
Explain source inspection.
Define standard cost
What general data appears on basic data screen?
What is time phased Planning?
We want the system to run a single level mrp automatically on receipt of the sales order. How to configure triggering event based mrp?
Explain what is plm (product lifecycle management) in sap pp and what is the use?
Explain what is routing in sap pp?