what do we mean by hook up drawing. what r the information we
get from it?
Answer Posted / maulik vyas
hook-up drgs provides detialed information about how to
install an instrument in proper manner..
it also includes the details of Bill Of Materials..
It is necessary document for project engineering as well as
maintenance dpt..
| Is This Answer Correct ? | 53 Yes | 3 No |
Post New Answer View All Answers
what is The specifications for oriface instalation
What is the use of temprature compensation?
steps for installing orifice plate?
what is the difference between scaler and vector drive
What are the types of control valves available
Isometric drawings are generated during _________________ phase of a project
Explain the difference between mmwc and mmwg?
how to calibrate and troubleshooting of leveltroll?
on interface level transmitter model(RTG3302-EMERSON) What is threshold valve how can we select correct threshold value T1,T2,T3,T4 When interface water & hydro carbon
what is the criteria to decide conductor size of a cable ?
where proximity sensor installed on tank in loading arm application
what step is taken for ESD ( emergency shut down) in DCS REPLY to hashimka20009@gmail.com
There are many type of control cable like pair,core,tried, What are defination each one
State bernoulli’s application.
what is the imbustion control loop