To construct 100sq.yard what will be the cost in detail pls
Answer Posted / sjtbehera
1 yard = .8361 sqm = 9.028sqft
we apply Rs 450 per sqft
total coast= 9.028*450=Rs 4063.00
Note- Rs 45/ sqft0 is taken as bulding cost
| Is This Answer Correct ? | 3 Yes | 7 No |
Post New Answer View All Answers
What is the difference between undo & redo?
do we decide reinforcement steel , based on bending moment ? give example with continous slab?
A Cat excavator loader of 3Lm*3 heaped capacity bucket is to be used to load blasted rock directly into a crusher of capacity (consumption) of 100L
Re: Can anybody help me by attaching files , formats for quality checks of common building materials like cement , concrete , bricks , sand and aggregates? please my email id is smgujjal@gmail.com
how much cement is consumed by a stone masonry wall 17.7m long,0.55m wide and 1m high
I am practising engineer. I am searching for tutorial of RCC T Girder design Example in staad pro.Do anybody has this?please help
we want build 10ft height ,tostore 4 litresof water.what is theground basement for steel andcement andsand.please send us basment calculation?
how much deduction will be in 32 mm dia HYSD steel bar for 45 and 90 degree bend
how beam.coloum ,slab, footing are designed as per indian code.. detail procedure?
what is the water-cement ratio of mix design while 30mpa in 7 days?
pls mail some more tecnical qustions at msaranya2610@gmail.com
what should be RCC material i.e iron rod(mm)x cement x stone x sand for laying of slab L 42'x B 22'x tk 0.375ft = 1nos & column of H 17'x15"x8" 2nos.
what is difference between NP2 NP3 NP4 CONCRETE HUME PIPES USED AT SITE
how many kg of 20mm, 10mm, dust available in one ton stone boulder
What is the crank length in the slab?