Answer Posted / sjtbehera
no
| Is This Answer Correct ? | 1 Yes | 1 No |
Post New Answer View All Answers
What is the bowing depth after stressing of PSC Girder of various spans and various dia of strands?
How to cal. The weight of hollow pipe?
A super elevation of 60 cm has been provided on a 8m wide road and a curve of 260m radius .calculate the max.speed in km/hr of the vehicle that can be negotiated safely? Plz answer with full solution.thanx
what is the dimensions of river sand truck trailer or trolly ?
Rate analysis of Vitrified tile in cement mortor 1:3
What you understand by building codes?
What are the skills required to become an architect?
In a beam,stirrups are placed closely at ends than at centre due to shear.similarly where would ties be closer to each other-at center or at ends in a column and slab.
There are two buildings one taller and one shorter whose time period will be grater and similarly the frequency ?
50 acre of land to be reclaimed for an average height of 2.5 mt. Dredging area is 500mx200m size. what is the dredging depth required to reclaim the area?
Normally in slabs, steel quantity is not added when you calculating concrete quantity for that slab, why it is not added ?
What is the purpose of the gap in the road on this bridge?
for Precast foundation howmany days required we can shift the foundation with american Standards i need reference with section any body can help
I am called for interview from north east power plant .so, I need some interview question which may help me.
IS THERE ANY JOBS FOR THOSE WHO ARE IN FINAL YAER OF ENGINEERING(CIVIL) IN MUMBAI