Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

What are the solutions for avioding sulfide formation at
bimetalic (Copper &Aluminium)overhead joints?

Answer Posted / smala

by using Bimetallic washer at joints / connections

Is This Answer Correct ?    5 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

why connecting surge unit in contactor coil

1824


Pl.brief me about Electrical power distribution system from Main generating station to Industry.What is the use of in between station.

2031


Is it required to lay GI wires along with GI/MS conduits from one point to another point though separate earthing cable is conncted from DB to Socket?

1928


Explain the role of a car driver as one of a feedback mechanism.

1135


hi i will D.E.E.E.is completed pls send rrb diploma old qustion papaer sent in my e mail. i.d.

2281


How does HT work & Voltage required?

2208


use of PIR in ehv breaker

2101


what is 3rd Harmonics? how it is generated in alternator

9336


i am an maintenance engineer. one distribution board have 5 feeder. recently its ELR trips frequently, but it take some times after trip( 10min,20min..)but 3 feeder no load. two feeder only loaded. i checked one feeder IR value all values are above 50Mohm.but B phase to Earth is only 9Mohm.any problem about low value

1875


A 15 kw squirrel cage motor having a maximum efficiency of 90% on a continuous full load has temperature rise of 42 degrees celcius after 30 min and 52 degrees celcius after 1 hr under the above operation conditions. a) calculate its final steady state temperature rise on continuous load and the heating time constatnt. b) if the motor is operated on a short load for 9 min estimate its temperature rise. c) calculate the maximum overload that can be applied on a short, 9 min rating so that the temperature rise is the same as the final steady state temperature rise on continuous load.

1058


What is the procedure/activities to be taken to inject the current more than 2000A by using 2000A Loading Transformer?

1963


can we choose current transformer secondary, to calculate residual flux in a power transformer, so as its saturation is close to the saturation level of power transformer?

1409


Why let through energy not considered for ACB breaker while cable sizing?

2343


Can you please explain creepage distance in detail, for a 6.6kV cable head what must the distance be and how do you determine it?

2817


Name one of major transformer company in KSA ?

1146