Which are the master data relevant for PP module?
Answer Posted / jvk
Material Master
BOM
Workcenter
Routing
Is This Answer Correct ? | 21 Yes | 3 No |
Post New Answer View All Answers
What parameters you maintain in “plant parameters” in configuration?
Explain the mrp group and their uses.
Explain Availability check.
You want to insert an inspection check point at the end of an operation. How would you do that?
What is the use of mrp list?
What are the basic dates?
What is the use of data in work centers?
What is the need of mrp list if the stock requirement list is already given?
Explain PI sheet.
What is Material status and which view of the material master it is available?
What is the SPRO Path for requirement class and req. type?
What is the difference between “planned consumption” and “unplanned consumption”? Can safety stock calculation be done on either of these?
Define mrp group
What is plm (product lifecycle management) in sap pp and what is the use?
Can we create production order without bom and routing ?