Which are the master data relevant for PP module?

Answer Posted / b.arun

M<aster data in SAP PP Consists of the following:
1.Material Master
2.BOM(Bill of Material)
3.Workcenter
4.Routing
5.PRT(Production Resource Tool)

Is This Answer Correct ?    53 Yes 4 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

Explain the stock requirement list and their uses.

592


How is the processing time calculated in a wc when both labor, machine categories exist?

672


Explain what is the use of sap material view and list out other parameters where sap material view is applicable?

610


What is the data you give in S.O.P screen?

2007


You want to insert an inspection check point at the end of an operation. How would you do that?

636






Explain about rough cut planning

1375


What is the purpose of Catalog? how you reverse UD?

1565


Can't one material be assigned to more than one operation in a routing, why?

612


Explain PI sheet.

1418


What is MRP Profile and MRP Group?

2315


Different types of consumption based planning.

2120


What is routing in sap pp?

786


What is serial number and where you will be configure

2116


What is testing & explain standard testing

1451


What is Planning time Fence?

1010