Which are the master data relevant for PP module?
Answer Posted / b.arun
M<aster data in SAP PP Consists of the following:
1.Material Master
2.BOM(Bill of Material)
3.Workcenter
4.Routing
5.PRT(Production Resource Tool)
| Is This Answer Correct ? | 54 Yes | 4 No |
Post New Answer View All Answers
What is mrp group and what is the use of it?
In lsmw which is most important step?
In tm, if a group of employees gets 10 days of annual leave, what will be the time evaluation status?
Explain variant configuration
What is time phased Planning?
What is the purpose of using capacity planning?
What is Backflush, the places where the backflush is used?
What is process keys
We have two storage locations are ‘0001’ and ‘0600’. Default storage location in process order is always ‘0001’ what determines this default location?
Scheduling times can be defined in the material master record by?
Mention what are the t-codes for creating, changing and summarizing bom?
What are dynamic actions? Give a few examples. What are it’s you used in them?
Standard mrp steps
How system calculate the actual cost?
How requirements( pir, sales order, customer requirement) are reduced after they are produced?