Which are the master data relevant for PP module?

Answer Posted / b.arun

M<aster data in SAP PP Consists of the following:
1.Material Master
2.BOM(Bill of Material)
3.Workcenter
4.Routing
5.PRT(Production Resource Tool)

Is This Answer Correct ?    54 Yes 4 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

Difference between plan cost, Actual cost and target cost.

2732


What are basic dates?

751


Have you used Pull list or back flushing in REM?

1753


Mention what are the types of master views for production and planning?

704


What is the use of t-code cs20 in bom?

855






Tell some standard order types and what configure done for current project

1700


What is the Difference between TECO and CLSD?

5084


Integration between PP and SD module.

1141


Explain the Difference between the Discreet and REM.

7707


List out the basic procedure for dispatching operations in capacity leveling?

755


Explain the process of Material costing.

1330


Explain the mrp group and their uses.

672


What are the production process in sap?

726


Explain Flexible Planning procedure or How many levels of Flexible planning.

1548


What is qualification deficiency? How will you come to know that a person does not have certain skills/qualification?

1060