Which are the master data relevant for PP module?
Answer Posted / b.arun
M<aster data in SAP PP Consists of the following:
1.Material Master
2.BOM(Bill of Material)
3.Workcenter
4.Routing
5.PRT(Production Resource Tool)
Is This Answer Correct ? | 53 Yes | 4 No |
Post New Answer View All Answers
Explain the stock requirement list and their uses.
How is the processing time calculated in a wc when both labor, machine categories exist?
Explain what is the use of sap material view and list out other parameters where sap material view is applicable?
What is the data you give in S.O.P screen?
You want to insert an inspection check point at the end of an operation. How would you do that?
Explain about rough cut planning
What is the purpose of Catalog? how you reverse UD?
Can't one material be assigned to more than one operation in a routing, why?
Explain PI sheet.
What is MRP Profile and MRP Group?
Different types of consumption based planning.
What is routing in sap pp?
What is serial number and where you will be configure
What is testing & explain standard testing
What is Planning time Fence?