Answer Posted / mahalingan/vinoth
qa: quality assurance
this is carriedout by the clients with help of codes
and standards to inorder to give assurance for the design
period.
qc:quality control
this is carriedout by the contractor with the help of
approved QUALITY ASSURANCE PLAN AND PROCEDURES.
| Is This Answer Correct ? | 5 Yes | 1 No |
Post New Answer View All Answers
PLESE SEND ME OLD TECHNICAL N APPTITUDE QUESTION PAPERS
What will you do when scavenge fire happened?
Define grashof number [gr].
Explain how to measure crank web deflection?
Which theories of failure are used for brittle materials ?
What is the material used ball screw rod
What s gland sealing steam?
what do you mean by resistivity survey of tubewell
what is inlet gas pressure of ge 9 fa gas turbine ?
At 50 Centigrade (Fuel oil) what is its cast?
I am a post dip. in machine maintenance , 2004 passed out and i am persuing my graduateship in industrial engg. and i would like to know, whether i am applicable to do any certification cource . And i would like to know, whether i am eligiable to do ann master degree since i have working experience of more than 8 Years in Larsen & Toubro,
what is the diffrence betwen primary pumps and secondary pumps in aircoditioning field
What is caustic embrittlement ?
Name the machines you know?
What causes white smoke in two stroke locomotive engines?