what is project system Landscape?
Answer Posted / sudheer
In general this project system Landscape maintains minimun
of 3 servers/systems.
They are
1)Development system
2)Quality Assurance
3)Production System
All these r in sequence.
Depending upon the client requirement we can extend the
Quality Systems & Production Systems to more than one.
Is This Answer Correct ? | 15 Yes | 1 No |
Post New Answer View All Answers
Program for Prime numbers and Matrix plz explain me the procedural method with steps
What is the definition of modification in an sap system and how do they impact an upgrade?
How to select valid lines for secondary list?
What are the mandatory fields to be filled for BAPI_CUSTOMER_CREATEFROMDATA1
Explain get pernr concept when we use logical data base? : abap hr
What should be declared explicitly in the corresponding abap/4 statements to access internal tables without header lines & why?
What is the different type of projects? : sap abap hr
What is pass by value and what is pass by reference? Which is better?
What are the problems in processing batch input sessions? How is batch inputprocess different from processing online?
Hi, I have a requirement for locking the fax field in user master records. As you know user can edit the details using the System>profile>own data (SU3), it is causing some security threat to our model. What i want is users should not be able to change the fax field under communications when they get into su3.I have heard of user Exist functionality but don't know how to implement it. Can you suggest something, it will be greatly appreciated.
How do we handle multiple line items in BDC's.
what is defference between repository and non repository Object?
What is the difference between call transaction and session method? : abap bdc
Define the various contents of technical specifications ?
What is the first thing you do after vendor setup is complete?