In case of a beam ,main steel is provided along the longer
span because, bending moment is directly proportional to
length but why in case of one way slab main steel is
provided along shorter span while as bending takes place
along longer span?comment
Answer Posted / pratyush mohan jha
to avoid cofusion provide reinforcement in direction
perpendicular to flexural crack.
in case of slab---- yield line is parellel to longer span,
hence reinforcement is provided parellel to shorter span.
in case of beam flexural crack occures parallel to cross
section ( not parallel to length of the beam). hence
reinfocement is provided horizontally parralel to length.
| Is This Answer Correct ? | 17 Yes | 0 No |
Post New Answer View All Answers
what is the weight of 12mm aggregates?
For elevated service Reservoirs what will be the output of each skilled carpenter and bar bender.
What difference comes in constructing of house and a housing complex like society
Define What is a projection line?
by which materials we can prepare circular shuttering with tentative cost of material(rate analysis)
What things you need to take care of before building a kitchen island?
why we create short columns under grade slab?
How much percentage of brick bats allowed in CD-75 bricks
What are the different types of runners?
How Can I know the wastages(%) of each work added in estimating the quantity of construction materials?(Eg. Ceiling Work, Brick Work,etc....)
Will water damage concrete?
Explain major differences between routing maintenance and major maintenance.
What is meant by cartesian coordinate system?
What is the mix propotion of M10,M15,M20,M25,M30,M40,M50.M60 cement content,aggrigate,sand and water ratio.
how much cement is consumed by a stone masonry wall 17.7m long,0.55m wide and 1m high