Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

In case of a beam ,main steel is provided along the longer
span because, bending moment is directly proportional to
length but why in case of one way slab main steel is
provided along shorter span while as bending takes place
along longer span?comment

Answer Posted / pratyush mohan jha

to avoid cofusion provide reinforcement in direction
perpendicular to flexural crack.

in case of slab---- yield line is parellel to longer span,
hence reinforcement is provided parellel to shorter span.


in case of beam flexural crack occures parallel to cross
section ( not parallel to length of the beam). hence
reinfocement is provided horizontally parralel to length.

Is This Answer Correct ?    17 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

Define What is the origin of name Railway Sleepers?

1276


pile load testing procedure

2216


whou haat goals do you have in your career

2149


what is Short bored pile foundation.

2715


Explain major difference between auto level and dumpy level?

1190


What is thumb rule in quality and quantity estimation of a Residential building??

1654


What is portland cement

8087


what is mail role & relationship between senior Civil engineer to consultants , Construction manager ,project manager, project engineer ,Technical engineer & qa/qc engineer ? what is the responsibilites of Senior Civil Engineer?

2266


Define a polyline?

1233


How much Tolerance factors like 1. brick work 2.plaster 3.painting 4.floor tiling 5.wall tiling 6.shuttering 7.concreting 8.steel

1836


how to calclate the SHUTTERING TAKEN CONCRETE LOAD? WHAT IS THE LOAD BEARING CAPACITY IN STEEL SHUTTERING PLATE? WHAT IS THE CONCRETE LOAD IN (MASS) IN THE SHUTTERING PLATE. PLATE SIZE IS 120CM* 90CM CONCRETE WALL LENGTH IS 10M ,WIDE IS 60CM, HEIGHT IS 1.2M PLS TO SENT THE CALCULATION.

11045


What is the cost of shuttering per Sqm.? How it is calculate by thumb rule...?

1967


if i have to draw bending moment diagram of 4 way continous span then how to create it and how to find reaction?

1994


HOW MANY BAGS OF CEMEMT USED IN PER M2 OF PARTITION WALL

1451


how to tie 10 legged stirrups

6525