Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

Why Transformer in KVA?

Answer Posted / rajesh

transformer dosent consume power.it just step up/down the
voltage.thats why transformer mentioned in kva

Is This Answer Correct ?    2 Yes 11 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

What is Control & Relay Panel? And Remote Control Center?

2214


what is automatic voltage regulator?we can control the vlotage by using fuzzy controller in matlab?why we go for fuzzy?

1952


What do you mean by per capita requirement of electrical energy in india

2237


How much ph is maintained of water resistance starter for slipring induction motor ?

2402


why does make gain margin and phase margin on same plot.?

2081


Why insulation level follows this order? transformer < bus bar < circuit breaker & Isolator < transmission line.

2133


why only exciting current is shown not primary current in transformer???

1863


hi can any body send me syllabus of rrb electrical section engg... and past pepar also of any board...

2671


what is the operating time for LBB and how does the LBB relay realise whether cb is opened or not?

1974


can u please mail me the syllabus for GET exam for damodar valley corporation?

2067


Is there any type of starter for DC motor other than two point,Three point and Four point starters?

2036


A 7 storey building has a floor area of 35,000sq.ft on each storey. On the ground floor 11KV electrical sub-station is to be erected. A load of 3kw for every 400sq.ft (p.f is 0.8) is proposed for each floor. fire pump 7.5hp, water pump 5hp, lift 2 nos, each 10hp and 20shop load of each shop is 5kw. calculate a. load each floor b. total load of building c. L.T feeders for aech floor and from transformer to main. d. distribution diagram e. capacity of sub-station/capacitor bank f. line diagram

2809


STATE USE OF ARC RUNNERS & SPLITTERS ?

1944


how to find 5 kilo meter long under ground 33 kv cable fault location if IR VALUE shows 0.05 M ohm @5000 volt.and cable fault locator shows some time fault distance 3 kilo meter ,3.7 kilo meter and some time 1 kilo meter? now how to find the fault location that where is leakage. note--it is tested with 5000 kv megger and insulation resistance is 0.05 M ohm. and some time 0.03 M ohm comes.

2209


sir am giving jspl exam on 19th oct . i belong to eee, so plz send previous question papers ..........to dis id abhilash203@gmail.com

2561