Answer Posted / rohit p
To get the optimum use of available system resource like
work process. we could create operation mode by using RZ04
t-code. There first need to create operation mode like
active and batch than create instance. Add and subtract
work process to the instance depends upon requirements.
Than use sm63 for assign time to the operation mode.
Operation mode will change automatic without restart the
server.
| Is This Answer Correct ? | 3 Yes | 0 No |
Post New Answer View All Answers
What is redolog file? Path?
suppose in the landscape there is development, quality, pre-production and production system is there. what is the route(transport route) between pre-production to production? and why?
How to configure TMS?
What is oracle Architecture?
How will go about doing a client copy ?
how can i decleare select-options in module pool table control?
On a particular system how you can get a list of the users with development access on a particular system?
Do? If another user wants to share that lock but the user using that
Can you tell me about the landscape migration to cloud ?
How do you create an instance?
When we are doing cash sales, free goods and discount, How many pricing procedure do we need to create..? Only one PP required or have to create multiple PP..? and how many condition type we need to create..?
What is the difference between central instance & application server?
Myself Rahul am MBA(Mkt)having 1.5 years marketing experience.and in SAP-SD for 1 years experience.am looking for job.so pl anywher opening then pl let me revert.
i am arun, as of now i am working in a power plant. I did B.E mech and have completed PGDC in thermal power plant engineering from NPTI(NATIONAL POWER TRAINING INSTITUTE). I started my career in software oly , as i dono any software languages i got failed in conformation exam. Pls help me , i want to enter software field. in this powerplant field 6 working days for week and holiday is also not sunday, i am not able 2 tc of my family... pls help me how to enter sf fielf. my frds sujjested me 2 try as functional after 2 years. wats the procedure for that... pls pls help me in this issue I have 1 year exp in power plant, i knew mechanical design software. my id : arun0029@gmail.com
Error in the phase import_proper while applying support packages?