SOME TRANSFOMERS ARE KNOWN AS "INSTRUMENTS TRANSFORMER "
AND THEY ARE DEVIDED IN FOLLOWING---
1. C.T. (CURRENT TRANSFORMER )
2. P.T. (VOLTAGE / POTENTIAL TRANSFOMER)
C.T.
IT IS NOTHING BUT STEP UP VOLTAGE TRANSFORMER AND
RELATIVELY STEP DOWN CURRENT TRTANSFORMER .IT IS USED IN
MEASURMENT PURPOSE AS WELL AS PROTCTION PURPOSE OF
TRANSMISSION LINE ....
P.T.
IT IS STEP UP CURRENT TRANSFOMER AND STEP DOWN VOLTAGE
TRANSFORMER . IT IS USED FOR MEASURMENT AND PROTECTION OF
TRANSMISSION LINE....
| Is This Answer Correct ? | 11 Yes | 0 No |
Post New Answer View All Answers
Is it true online ups having bypass mode if it is true then why we called ups because it is interrupting power when goes in bypass mode
We have 5 Distribution sections with variable loads&We have 3 Gensets(500kva,380kva&250kva) our total load is between 400kva to 600kva. so how could we connect 3gensets.
Could u pls tell me the NPCIL electrical engineering interview questions for Executive trainee, and also guide me how to face the interview.
What are all present producing cost of Per KWH of various Fuel?
Why is remote backup preferred to local backup?
i am studying in final year can i allowed for 23rd UES of Indian army
How we calculat the NGR of 3phase Generator, Our generation voltage 11KV
Diagram and details of polarity test for Current Transformer 11kv 400/200/100/1A
What is the permissible limit of shaft voltage for 6.6 KV motors ? Why? Is there any standard is available?
what is cathodic protection and why it use in industries?
define the non synchoronism of synchoronous machine in general g or m??
Briefly define and explain the following different types of Pulse Amplitude Modulation (PAM) with some examples. i) 2-PAM ii) 4-PAM iii) 8-PAM iv) 16-PAM v) Quadrature Amplitude Modulation (QAM)
what is the difference between neutral and earth
How can we select suitable capacity generator for three phase load (inductive load) and how to take study analysis in 3 three phase load system ?
What will happen if we on 200kvr capacitor bank(11kv in bus)If there is low load on transformer (1.5 mva 33/11 kv)