All the background jobs are in released state and there is
a delay time
and the background work processes are in wait status. What
could be the
reason why the jobs are not in ready or active state and
the solution?
Answer Posted / syed mahboob feroz ahmed
Hi,
When ever a BackGround job is released and the status is
set to be in delay state then one should make out that
there are 2 instances V1 and V2 the scenario here is V1
stands for instance start without delay in time where
schedule time interval is not specified and if V2 then the
job if released will start only at the schedule time
interval Usually Background jobs run in the Night Time as
they are time consuming and in Day time Dialog Job runs.
| Is This Answer Correct ? | 0 Yes | 10 No |
Post New Answer View All Answers
How to assign a mass Tables in Auth Group by using T-code:se54
What is the procedure to applying patches?
How do you solve oracle archive struck?
What is a support package? What is its purpose?
What is a support package?
What is process for applying patches?
What are the pre requisite for the SAP Installation?
What is heterogenous system copy and homogenous system copy ?
What is the difference between developer trace, system log and system trace?
Which table contains the details related to Q defined in SPAM? Is there a way to revert back the Q defined? If yes, How?
What are the daily transactions?
Have you done any up gradations?
Can you change the profile parameter in the os level? Which one is advisable why?
How to configure TMS?
what is the use of psapundo tablespace? what is the error ora -01555 represents.how can u prevent this error?