what are the criteria for choosing the span for the bridge
(highway bridge)
Answer Posted / s. bhattacharya
One has to see both loading and support conditions for
choosing the span for a highway bridge.
| Is This Answer Correct ? | 1 Yes | 0 No |
Post New Answer View All Answers
what is the procedure involved in preparing mix design of m15 grade as per IS-10262-1982
difference between fc and fc'?
What are the different approaches in designing the floors of the service reservoirs?
Design a cantilever slab to carry a live load of 2000 N/m2. The overhang of the slab is 1.20m. b) A slab over a room is 4.75m x 4.75m. The edges of the slab are simply supported and the corners are not held down. The live load an the slab is 300 Kg/m2. The slab has a bearing of 15cm. On the supporting walls. Design the slab as per Rankine - Grashoff theory. Assume weight of R.C.C. = 2400 Kg/m2.
Time required for curing of wall tiles before fixing
Suppose a new brick wall is being constructed,and the courses and not aligned horizontally,what negetives can it cause?
What applicable rate of wct in bihar
How much does it cost for a R.C.C cover slab of size (450mmX 600mmx 100mm) double rf net given in feets using hand mix concrete?
How to calculate the cement plastering for circular and rectangular water storage tanks and how to calculate the area of circular and rectangular floor?? Please help me
How to calculate 1 brss for RCC work
if a pipe those configuration (ASTM c 76 class b 450mm dia 2500mm length) fixing for water course those lining of water is 7000 running meter. my question is that if 8 joints of pipe ls leakage and we have not permission to stop the water so which treatment we apply on joint in that in condition.
How does a traffic light signal work ?
What black man invented the clothes dryer?
what is pile and deam foundation
what is the amount of absorption of slurry in shuttering ply board. what is the amount of slurry leakage allowed for 1 m3 of concrete.