In pile foundations, as we all know, the strength of the pile depends on two factors, namely end-bearing and skin resistance.. Thus, the skin resistance is the factor which depends on the Pile Socketing Length and thus it depends on the type of underground soil, estimated design load, number of piles in the pile group, reinforcement used.
| Is This Answer Correct ? | 1 Yes | 3 No |
Post New Answer View All Answers
Describe the role of independent Quantity surveyor?
What are the important hardware systems used for cad?
How to decide/consider the grade of bitumen for dbm.
In few lines, please be elaborative on extras and talents that make you a potential candidate for the post:
what is floating slab foundation?
If density of cement is 1500 Kg/m3, the how is specific gravity 3.15 ? (Density of water is 1000 Kg/m3)
What is Base Shear ?
why the profile of shell of natural draught cooling tower is hyperabolic.
is there any thumb rule for calculating construction cost of the building with pile foundation per sft. area?
what is civil all interview questions
What is difference between engineering stress and true stress?
how to calculate the rebar depth if forgot the foundation reinforcement (main steel)? is that any calculation or formula we have data sheet of supplier what depth what is the pull out capacity is mensioned in data sheet. if any IS code than its help full to me.
if we use 1.25 bag of cement 3 pharma metal and 2 pharma crush sand what is the strenghtexpected for RCC column
In Residential home construct footing,beam, column,lintel,rcc roofs which dia rod used how to self assumed
In an aggregate blending plant, water is sprayed before blending is performed. If the fine content in aggregate is as high as 25 %, will not the fines form into lumps / balls and distribution will not be uniform ? Further, the fines will stick onto the interior of pug mill and its content will be low. The mixed material is stockpiled for weeks / months before use. Will it not be better that blending is done in dry condition, and water will be added only during compaction at site. Please forward your comments and suggestions.