while extending the material master view after saving error
is coming that the field material number is defined as a
required field,it doesnt contain an entry. After selecting
that it is showing the particular material may be locked.
Pls do the needful.
Answer Posted / razesh
It means either you/somebody are viewing the material in
seperately with mm02 tcode.So it says locked by user XXXX,
and you can know the user also.ask him to exit and try to
save it.
| Is This Answer Correct ? | 2 Yes | 0 No |
Post New Answer View All Answers
Define mrp list
What does a PP Consultant do in his/her real time?
One component we can assign to workcenter at routing
What is Phantom Assembly?
What are the levels of batch, explain batch determination process?
How to delete a group of products that was created in screen mc84 ?
What is Production scheduling Profile and use of it?
We want the system to run a single level mrp automatically on receipt of sales order. How to configure triggering event based mrp?
Why is work scheduling required for semi finished and finished products?
Mention what are the production process in sap?
What are the steps of production execution process?
Define mrp controller
How did you configure the payscale structure?
Both labor and machine categories exist. How would you calculate the process time?
How to group employees for their allowances in payroll?