Answer Posted / kunal
The rate of change of the output voltage when the control
signal is in the hold state.
The droop rate is due to leakage currents flowing on or off
the hold capacitor and therefore the droop rate is less for
large capacitors.
dVH/dt = Ileakage/CH
VH: Hold voltage
t: time
I: current
C: capacitor
| Is This Answer Correct ? | 8 Yes | 31 No |
Post New Answer View All Answers
If any HVDC line is going with positive & negative(the negative usually have return path of current with earthing electrode). Now the question is if this HVDC earthed electrode which is using as return path and earthed any nearby 400kv or 220kv AC substation equipments. which will be the impact of this on AC substation & its equipment, how severe may be this and what should be the minimum distance require between HVDC earthed electrode and AC substation equipments? It's really an high engineering level question...Dare to answer and increase your knowledge.
before transformer oil dielectric strenght tests are taken the oil should be allowed to settle to remove option 1 air bubbles 2 gasses 3 contamination 4 water
How can we increase the capacity of Energy.?
What are the advantages of skewing of cage rotor conductors?
what are the safety measures of induction motor?
Types of test in Switchgears, MCC, NGR and DB's how it should be procced. Can anyone give me the details here or email me to pasuvaraj.k@gmail.com
what is the difference between fault current ant short circuit current?
What is the difference between hot and cold loop testing?
how the phase convertor changes the no. of phases
What is method of calculating the fault current for a MDB, 50KW, 3PH, 415V, 50HZ?
sir iam a 3rd yr eee student.no core company comes for recruitment to our college.my aim is to be placed in l and t.tell me the procedures.
best manufacturer for busbar for outdoor switchyard having double bus bar scheme, can any one share technical specification of busbar. 132kv voltage ?
We normally make oil soak pits under Transformers. Oil from soak pit goes to collection pit. We provide granules/pebbles under transformers. My question is weather granules/ pebbles to be filled in soak pit or not? if yes upto what level?
what is the meaning of impedance protected in instrument cooling fan
What is a differential amplifier? Also, explain cmrr.