While both provide backup power during mains outage, with
the UPS the switch is instantaneous whereas with the
Inverter there is a gap of a second or two. This gap is OK
for household gadgets such as lights, fans, fridge, etc.
but not OK for computers.
In technical terms:
UPS: The mains power comes to the UPS. The AC is converted
to DC and this DC is constantly charging the battery. The
output of the battery is fed to the Sine wave inverter and
it converts DC to AC and this feeds the equipment. Since
power out is always drawn from the battery, there is no
time lag when mains swicthes off; it justs stops the
battery from being charged and the UPS continues to supply
power till the battery runs out.
Inverter: The mains power comes to the Inverter. This is
directly sent to the output but the AC is also converted to
DC and this DC is constantly charging the battery. A sensor
and relay mechanism checks whether the mains is ON or OFF.
When the main switches OFF, the relay actuator triggers to
switch from mains to inverter. Rest is same like the UPS.
Because of this sensor and relay, there is a gap between
triggering.
| Is This Answer Correct ? | 6 Yes | 1 No |
Post New Answer View All Answers
is it necessary to earth the rmu before cutting off the transformer winding?if yes why?
what is the difference between dry and wet type of 132kV terminations. which one is durable
What do you mean by distribution transformers?
we have provided 30 nos. relay contacts in panel.I want to know how do we do the numbering for the relay contacts as per any applicable standards
what happend to DC shunt motor if its field winding insulation becomes slightly weak? will that motor can run on full load or not explain in detail. thanks
Can 4pole (3 phase+neautral )RCCB proper functioning in only 3 phase load (no neautral, no Earth) ?
At what factor resistance r of a conductor depends?
what is the effect of earth on capacitance in 3-phase and 1- phase transmission line?
How to choose the vector group for the step up and step down transformers??? Tell me the which vector group is suitable for step up and step down transformers and whats the reason to choose and whats the benefits???
I completed my BE EEE degree 2006 .... which license should i apply .... ?????
WHAT IS FAULT CAPACITY OF HT MOTOR TERMINAL BLOCK? ANY BODY HAVE ANSWER PLZ....POST IT.
Can we check ELCB constantly from R1 to R8 phase in 1 no DB?
What is industrial plc
The sodium vapor lamp is not glows when it is connected a distance of 5 meters above from gearbox, why ?
Draw the vector diagram and condition for the following: 1) Dyn1 2) Ynd0 3) YnYn0