Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

What are the causes of failure of foundations and remedial
measures?

Answer Posted / sachin

soil is the main cause of faliure.
proper type of foundation should be adopted for perticular
soil. also precaurcations should be taken to menimise the
shear in soil.

Is This Answer Correct ?    17 Yes 3 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

how to identify np3 pipe and np4 pipe

1990


What are the joints wants to made in masonry where door opening, arches like etc..

1671


Providing and casting in situ cement concrete M-25 of trap/granite/quartzite/gneiss metal for rcc, Providing formwork,Curing the concrete and Complete. what is rate per Cum. and what is rate for M-30 Grade Concrete.

3417


one steel fixers how much ton steel fabrication he will do same how much tone he will binding?

1899


what do you understand by M25 concrete

2367


What are moment of inertia and its importance in civil engineering?

1214


List out some of the common problems that architect have to tackle it?

1028


in block masonry l=10',b=0.5',H=10',Calculate cement ,sand and no.Of blocks?

1929


What is geopolymer based concrete?

2667


How to calculate Acctually Brickwork Quantity in Honey Comb Brick in circular Soak Pit

6448


How can calculate the requirement of steel bars of rcc slab for 1100 sq ft?

1965


The internal dimensions of a wire house 15m*5.6m and the maximum height of piles is 2.70m. What is the maximum number of bags to be stored in two piles ?

2163


how to estimate man power for estimating the time required for completion of a project in terms of carpenters,barbenders,masons for block work ,masons for plasteing ,unskilled labour, painters, tiles masons,plumbers and electricians for medium and high rise constructions and independent villa projects.

3719


what is the painting co efficient of slope roof tiles?

1883


Specific gravity of cement?

1600