Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

the minimum percentage of steel for 2m rcc slab

Answer Posted / pallavi

0.12% for mild steel bars,o.15% for hysd bars

Is This Answer Correct ?    27 Yes 13 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

All aptitude question of Bechtel

1932


What is the cost difference between site mix and ready mix concrete per cubic meter

1935


Why the finite element method is lower bound solution?

3044


how many re use can use shutting material. timber ? ply? steel? plastic? fibre? aluminium? Doka?

2490


How many Sft of Level Plaster per Kg

1658


what's the formula for calculate pcc for matt(45mm aggregate)?

2799


How much Tolerance factors like 1. brick work 2.plaster 3.painting 4.floor tiling 5.wall tiling 6.shuttering 7.concreting 8.steel

1896


Name the main components of a cad gui?

1556


what is the theoritical percentage of concrete cubes testing per day?

5197


in one SQM plaster how much Cement and sand consumed in ratio 1:4

2284


relation bet Coefficient consolidation Cv, time factor Tv, drainage path d, & time t is Cv=d2Tv/t Cv=d2t/Tv Cv=tTv/d2 Cv=Tv/td2

3067


in levelling operation the first site on any change point is back site the second site on any change point is fore site the line commenses with fore sight & closes with backsight the line comensses with back sight & closes with fore sigh

2318


Gidc technical que paper

1809


As per Kandal suggestions, we have implemented rolling starts on 140 (+/- 5) degrees and we kept 3 rollars to complete the rolling before falling 125 degrees and the Aggregate AIV is below 22. But When the DBM bed is being rolled 3rd high viabration, (Before 1 plain & low ,2 high Viabrations), the aggregate is getting sharp edge agg. projections are damaged. As the literature is said that, the VG-30 Grade having better control the temp. susceptibility than Penetration grade. if so we could not get this problem at site. But we are facing on site. let me know.

1994


what is called Bulk Density of aggregate?

1919