Answer Posted / dhaya
Sahara
| Is This Answer Correct ? | 11 Yes | 0 No |
Post New Answer View All Answers
The size of a program is N. And the memory occupied by the program is given by M = square root of 100N. If the size of the program is increased by 1% then how much memory now occupied?
k, l are men who take home a salary of x, y respectively.the total amount taken home is
One clock rings 7 O'clock in 7 sec.In how many seconds it will ring 10 O'clock.
There is a safe with a 5 digit number as the key. The 4th digit is 4 greater than second digit, while 3rd digit is 3 less than 2nd digit. The 1st digit is thrice the last digit. There are 3 pairs whose sum is 11. Find the number.
If POINT + ZERO = ENERGY, then E + N + E + R + G + Y = ?
1992 Feb have 5 Sundays. In which year, the month Feb have 5 Sundays next?
A person spending out 1/3 for cloths , 1/5 of the remaining for food and 1/4 of the remaining for travelles is left with Rs 100/- . How he had in the beginning ?
Find the next series number : 21, 463, 687, 238, 1134, ----
A farmer has a farm square of 100 sq.m a cow is tied at one and with a rope of 10m length.assume pi-3.what is the area of land the cow can graze.
Rahul took a part in cycling game where 1/5 ahead of him and 5/6 behind him then total number of participants?
If 1/4 of the time from midnight plus 1/2 of the time from now to midnight is the present time,then what is the present time ?
box 1 cotain odd value X or Y the box 2 =X i.e 7 or 12 box 3= Y has value 19 if X is 7 or 31 if x is 12 get even value X or Y Use any operator steps allowed 3
i attended sbi clerical interview on28/04/10.on 20/08/10 i called sbi headoffice 022-22024619 they said tht final result will be declared after 2 months.i also had another no 022-22826300.if anybody are interested cal those no's.my mobile no is 9010347790(udamsingh)
The lowest temperature in the night in a city A is 1/3 more than 1/2 the highest during the day. Sum of the lowest temperature and the highest temperature is 100 degrees. Then what is the low temp?
There are three trucks A, B, C. A loads 10 kg/min. B loads 13 1/3 kg/min. C unloads 5 kg/min. If three simultaneously works then what is the time taken to load 2.4 tones?