4-Why we measure the insulation resistance of main core and
frame in spite of that must be connected with ground
before energize the transformer?
Answer Posted / sr
Before energizing the transformer we are conforming that
the insulation of the core is healthy.if it got earthed
twice there will chance of circulating current during fault
condition.
| Is This Answer Correct ? | 1 Yes | 2 No |
Post New Answer View All Answers
Any one can explaination about calibration with rotating sub standards?
WHTA IS LIMT OF LEAKGE CURRENT OF 11 KV 1 CORE 1000SQ.MM. XLPE CABLE.LOAD ON CABLE IS AROUND 600AMP .LENGTH 500 MTRS.
Please tell me the formulaes while designing a substation for power Calculations in designing a 33 KV Substation?????
tell me about eletrical contractor
Hoe do calculate the Cable size for Amps rating ?
what is the safety points of vaccum circuit breaker.
Dear all, how we select the cable size according to current with or without including different correction factor , is there any direct method for sizing of cable...
What is cut-off rate?
what is the use of Auto re-closer?
What is meant by positive and negative feedback?
what are the installation procedure of high voltage power transformer,CT,CB&PT?
Explain the operation carried out in thermal power stations?
how to calculate the torque of a motor?
what is the chiller and working principal
How can I model an open-delta ground transformer for a network supplied by 4 unit GTG and power transformer in ETAP?