Answer Posted / smohiahmed
A Deferred bug would be a funtionality needed in the
application which could have been missed by the BA and is
raised as a BUG. An undeveloped funtionality which would
can be deferred for future releases.
e.g : Think of a search engine and as the user enters
letters the application should suggest words accoridngly.
Incase the tester raises a bug saying that the words should
be shown as a hint to the user. Since this funtionality is
not yet developed it can be deferred to future release.
Hope the question is answered.
| Is This Answer Correct ? | 10 Yes | 0 No |
Post New Answer View All Answers
How to create a scenario?
What are different types of vuser logs which can be used while scripting and execution? What is the difference between these logs? When you disable logging?
What are the element in the loadrunner controller?
Why do you create parameter?
How do you identify which values need to be correlated in the script? Give an example.
What is run-time-setting?
How can we edit the vuser script?
What is performance testing in loadrunner?
What are the advantages of load runner?
Which components have you used in loadrunner ?
Difference b/w 9.1 and 9.5 Versions in LoadRunner?
How can you test the global servers with using loadrunner
What is the think time?
What is the difference between hits/second and requests/second?
What is the advantage of running vuser as a process than a thread?