Answer Posted / tim
is it COIS or COOIS?.If it is COOIS,then it is for
production order information system.
| Is This Answer Correct ? | 15 Yes | 0 No |
Post New Answer View All Answers
What is meant by slab?
How to delete a group of products that was created in screen mc84 ?
How mrp (material requirement planning) types are classified?
What are the t-codes for creating, changing and summarizing bom?
list the important tables used in pp.
Why work scheduling view is required for semi-finished and finished products?
What is sap pp?
What is Inspection Points?
Different types of consumption based planning.
What does a PP Consultant do in his/her real time?
What is the use of stock requirement list?
What is prt (production resource tools) in sap pp?
what are the problems you faced in MRP?
What is the difference between pp and pp-pi? Which one is better and how ?
What is the use of infogroups?