Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

In footing (mat) if two different dia of rods are to be used
which rod should be placed at top and bottom ( eg. 10mm &
16mm dia rods)

Answer Posted / jambu

Always bigger dia should be laid at bottom and it should be
provided on shorter directions.

Is This Answer Correct ?    61 Yes 1 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

how to convert cement, sand aggregate quantity from M3 to kg with full description?

2113


can we make bricks using m10 grade cement concrete and what would be the ratio of raw materials used and price per brick ?

2573


Formula of mid span bar

1950


50 acre of land to be reclaimed for an average height of 2.5 mt. Dredging area is 500mx200m size. what is the dredging depth required to reclaim the area?

1966


What is GSB gradation

2498


What Is the Thumb rule to calculate depth and dia of pile required to carry specified load on differeent soil

2777


what is the types of door's wood?

2092


What is the worlds largest concrete dam?

1251


What is the use of mirror command?

1309


How to calculate quanty of steel in four leg stirrups?

1943


What is change order request?

1106


how many re use can use shutting material. timber ? ply? steel? plastic? fibre? aluminium? Doka?

2450


I have certain queries, please help to solve. a) length of pile bore is 4m.excavation quantity will be area * length where area will be pi/4 * dia*dia. Is this right? b) It is a single reamed pile of 300m dia and reamed dia is 750mm. can any body help me to calculate excavated quantity of this bulb(reamed section),, concrete quantity in bulb with showing the formulas to be used?

2093


Pls provide me with the calculation or codes related to de- shuttering of flat slabs

6903


plz drive the formula d2/162.162 for the calculation of weight of steel bars????

38524