3. Given the DOS Specification below and the following
information:
• Indicator 50 is off
• No records have been written to the subfile
What will be the result if the EXFMT operation code is
performed on the record format CTLR?
A R SUBFL
A DESCRIP 101 6 1ODSPATR(UL)
A DFT(’NOT FOUND’)
A R CTLR SFLCTL(SUBFL)
A N50 SFLDSP
A SFLDSPCTL
A SFLINZ
A 67 SFIJEND
A SFLSIZ(13)
A SFLPAG(12)
A ACCOUNTNO 100 S 10
a.) Only AccountNo will display
b.) SUBFL will be initialized with 13 blank records
c.) An I/O exception error will occur
d.) The screen will display 12 records with ‘NOT FOUND’

Answer Posted / naveen chanda joshi

I think, the answer is option D. If default value ('Not
Found') was not mentioned then it would have display 12
blank records..

Is This Answer Correct ?    7 Yes 1 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

Interviewer asked me write down DDS for load all subfile .can anybody write dds

1022


what is file information data structure?

1376


what is data area and how it is used in rpg program ?

758


what is an online rpg?

731


What is the difference between copybooks and subprocedures in as400?

812






How to call one program from another program in RPG? please help me with the code

1261


If my rpg program has a date field, what extra care I have to take while compiling that rpg program? If the file is keyed and I have declared the file as well as key list properly in my program. Still am getting an error message like "chain/reade operation is not allowed" what may be the case?

622


What is the diff bw PF/LF Name and their Record format name? what is restriction in record format then file name?

2521


Q:HI friends accually ihave one problem plesase let me know the alternate code of this code. Related field description of code: Add a field, CALvsPRD, "Calendar Day Starts Before/After Production Day" to the parameter set WRKORDER which accepts values 'A' or 'B' o B = Calendar Day Starts Before Production Day o A = Calendar Day Starts After Production Day o Any other value indicates the production and calendar dates are always the same. code: Automatic Execution Of *INZSR Subroutine /Z01 * retrieves WRKORDER field values. /Z01 * Calculate default Production Date and return it to caller. /Z01 * Production date defaults to system date /Z01 C Eval P@Pdate = %DATE() /Z01 * unless Calendar date starts Before PDN(production) date and /Z01 * system time is before PDN Start Time then /Z01 * PDN date is yesterday. /Z01 C If W@CALvsPRD = 'B' and /Z01 C %TIME() < %TIME (W@Strtime) /Z01 C Eval P@Pdate -= %Day(1) /Z01 * unless Calendar date starts After PDN date and /Z01 * system time is *GE PDN(production) Start Time then /Z01 * PDN date is tomorrow. /Z01 C ElseIf W@CALvsPRD = 'A' and W@Strtime > *Zero and /Z01 C %TIME() >= %TIME (W@STrtime) /Z01 C Eval P@Pdate += %Day(1) /Z01 C EndIf /Z01 C Eval *InLr = *On

2015


how does the rpg element work?

718


What is ment by record level identifier?

657


How to define data area in RPG program? In which scenario multi occurrence DS is use in AS400?

1563


what is the procedure and explain about real time scenario.

1482


How many program bind in one module....

2125


We have job which is running as batch. It takes atleast 06 hours to complete tht job. But I wanna do tht job with in 3 hours?

773