Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

What is WLD System????

Answer Posted / parveen

it is water leak detection system.basically it is used in
data center/ server room. it is many types1. wire based and
snesor based. whenever water touch to the cable then alarm
will generate.

Is This Answer Correct ?    27 Yes 1 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

How to work E.L.C.B and how to connect in circuit.

2012


What is a Phase shift meter? Where can I get one?

2233


what is the reactance,capacitance & impedence electrical armoured & unarmored Cables.

2198


What do you mean by cogeneration? What its working principle?

3202


write circuit diagram for a motor rotate in forward direction once it started and when pressed the same button it should rotate in anticlockwise.

2549


bsnl tta exam question

1870


why we r not earthed Control cable of C.T. terminals

2028


Tell me the reason of connecting domestic t/f primary in star or delta,and also secondary side.

1967


what happens if dc supply is given and the remedies for it.

1809


while doing high potential for 11KV 3 core cable how much leakage current will obtain?, what will be acceptance value?

2873


How to perform a DC resistance test In Alternator and their proceduces?

1752


where does 22kv line starts

3090


Explain thin film resistors and wire-wound resistors

1016


How many VSC based HVDC are there in India and the world

2231


This is reqd for a 1MW Solar power plant..We have 2DC outputs from the solar panels Connected to 2INVERTOR panels.. Output from invertor is 3ph,280v,500kva,50hz.These are connected to individual ACB.This has to be stepped up to 11KV ,1250KVA SYSTEM.Now can I use (1) one more ACBTO GIVE A COMBINED OUTPUT OF 1000KVA,280V & STEP UP THE OUTPUT BY USING a single two winding 3 ph transformer 11kv/1250kva. or (2)use the two outputs and connect to one three winding transformer of above rating..Pls suggestwith details.

2473