how to run the qtp scripts in Test director.is it posssiblr
or not??
and also i want to see the previes test results,how to see
and where to see??
Answer Posted / uday
Hi,
You can run a test case in two ways.
1. Just go to test case -> click on "Test Script" tab of the
test case ->Click on QTP icon -> QTP will open -> Just click
on Run.
2. Create a testset and assign the test case to that
testset. Now run the case in testset. It creates a separate
instance of the test, so you can view all the logs of the
earlier test run.
Thanks,
Uday.
Is This Answer Correct ? | 0 Yes | 1 No |
Post New Answer View All Answers
How do you ensure that there are no duplication of bugs in Test Director?
What databases can test director reside on?
What are the 3 views and what is the purpose of each view?
What are the drawbacks of TD??
Of course, Test Director has recapped as Quality Center. What is the main difference between 8.2 version and 9.2 version of Quality Center?
How to map testcases with requirements in test lab?
How to identify test cases with no scheduled test runs.
How can we export multiple test cases from td in a single go?
Explain about user authentication in TD related to OS?
How do you analyze your test results? What metrics do you try to provide?
Can anyone tell me where i can Download free full version of test director
How can we add requirements to test cases in test director?
How can you run automated test cases td (quality center 9.0) ?
Disavantages of document generator? How to take a print out of the steps in the Parameterized scripts?
What is quality center( test director)?