Answer Posted / jeganathan
IT IS AN EMPRICAL NUMBER ARRIVED BY DIVIDING SUM OF THE
CUMULATIVE PERCENTAGE RETAINED BY 100.
F.M OF SAND VARIES FROM 2.2 TO 3.2
| Is This Answer Correct ? | 30 Yes | 12 No |
Post New Answer View All Answers
List out the types of roofs?
what are the challenges of being a team leader and a supervisor?
how to calculate the material from ratio of work PCC, RRM,POINTING, RCC
For Wet Mix Mecadam design what is Optimum moisture content
What is the wall thickness of NP-3&NP-4 hume pipe as per I.S code
i need the syllabus for the direcr recruitement of executive engineers in andhrapradesh
Is it possible to make a feature using an overdefined sketch?
what is Quantity of stone and sand required for one cubic meter of stone work (UCR)
How to do rate analysis for concrete work including shuttering work?
Which condition will prevail for the design of a swimming pool ? When the pool is empty or when it is filled ?
Whats the meanig of ,'K' VALUE in the case of soil.....
please give the detail design for the soring and shuttering for 8.5m deep excavation in the sandy soil for 25x10 rectangular streaches
Which are the Steel tests ?
hi, i am doing my B.tech third year and i want to have a job in Genpact...So can you help me which kind of job would be more appropriate for me in such a company and How should i prepare for an interview?
Explain what are the phases inspections are done by local authority while construction?