Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

How much should be the values and/or percentages of these
given below factors for a good controller ?

Steady state error
Delay
Rise Time
Overshoot
Peak Time
Settling Time
Damping
Oscillations & vibrations

thanks

Answer Posted / rajkumar

A proportional controller (Kp) will have the effect of
reducing the rise time and will reduce ,but never eliminate,
the steady-state error. An integral control (Ki) will have
the effect of eliminating the steady-state error, but it may
make the transient response worse. A derivative control (Kd)
will have the effect of increasing the stability of the
system, reducing the overshoot, and improving the transient
response.


for full details visit

http://www.engin.umich.edu/group/ctm/PID/PID.html

Is This Answer Correct ?    2 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

i am from instrument branch i want paper patern of mahagenco . any pevious years paper regarding my branch send me please . please.....

2080


What care will you take in the installation of control valves,SCADA,DCS and FOC in Oil and Gas Project?

2121


Instrumentation Safe Guarding test. How to determine the interval time of the test. eg:Halfyearly,Every year,Every three years etc.

2108


Actual using of tube bender to bend 2 opposite 90 deg at correct measurement center to center of tubing.

1883


In apron feeder how TPH is calculated?

1716


use of split range ? where it is used ? in which control loop it is used ?

1959


I need to know steps to Calibration Valve Guard......

1478


what is the input of digital counter during the the calibration time?

2307


A PLC is programmed to drive three motors A, B and C as follows : After running motor A for an hour, motor B should get ON and motor A should get OFF. And after running motor B for an hour, motor C should get ON and motor B should get OFF. And after running motor C for an hour, motor A should get ON and motor C should get OFF. (That is, a cyclic repetition with time period one hour) Now, the second condition is: If any motor gone faulty and is tripped, the consecutive motor should get ON and the faulty (tripped) motor should be eliminated from cyclic repetition. The remaining two motors should bear the cyclic repetition of one hour each. (For healthy motor take logic as high and for tripped motor take logic as low) Now, the third condition is: When motor A load(Amps) exceeds 60% of its rated load, motor B should get ON in parallel to motor A. And when both motors A & B are running in parallel, and if their load exceeds 60% of their rated load, motor C should also start in parallel to A & B. [Here the cyclic repetition is eliminated, until their loads become normal(40%)] [Take logic high(1) for load at 60% and logic low(0) for load at 40%] Now draw a flow chart or a ladder diagram to fulfill the above condition.

2166


Can combine control system for Emergency control system (ESD)and Fire & Gas System ( F & G) is possble to built and offer to client? Can such system is as per Norms in India?

1983


Describe the function of Accumulator into the Pump

1924


why would you like to join our company

1365


steps for installing orifice plate?

1840


Which type of diaphragm use in costic line, dm water line, natural gas line, oil line?

1164


How ejector(or)evactor air pump is working in thermal power plant?

6589