WHY DO WE PROVIDE DEVELOPEMENT LENGTH AND EXTRA BARS AT TOP

Answer Posted / muqdad jawad jafar

negative moment normally require providing extra additional
bar at the top of horizontal concrete casted members that
often positioned within the area supported by column/wall.
the top extra length should exceed the inflection point
between negative and posetive moment.

Is This Answer Correct ?    36 Yes 3 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

A doubly reinforced concrete beam is 25 cm wide and 50cm deep to the centre of tension reinforcement. The centre of compression is steel is 5cm from the compression edge. The areas of the compression and the tension steel are 10.16cm2 and 12.56 cm2 if m=18 and the bending moment at the section is 7,000,000 N-cm. Calculate the stress in concrete and steel.

1720


How can you achieve soil enforcement?

645


Explain the term 'Gross unit rate' and identify the items that may be included in the gross unit rate.

10835


How can we convert weight batch to volume batch for m30 mix

2449


Explain the latest method to detect a crack in a building?

684






How much cum. Brick work can do by 1 madon

1190


What is the Tor steel Consumption for residential building G+24 footing (thum rule) ?

1409


Explain what is structural frames or systems?

665


what is the difference between natural draught cooling tower and induced draught cooling tower

1833


pls give me ans to ACT formula cube testing porpuse

2549


please what is the number of bars required for a column of 6mx6m and 450mmx300mm,its a commercial building (Church)

1310


what r you reqired for concrete baching plant?

1913


what s the standrd size of pvc fittings ,like elbow, bend,tee etc ? please explain with figure ?

2043


Design a shear wall of length 4.20 m and thickness of 250mm subjected to the following forces.Assume Fck = 25Mpa and Fy = 415Mpa and the wall is a high wall with central part 3440mm x 250mm and two 380mm x 760mm strong bands at each end with following loading. S.No.       Loading        Axial force      Moment     Shear 1               DL+LL          1950              600            20 2           Seismic load       250              4800          700

1531


How to calculate 1 brss for RCC work  

1620