in transmission line 11kv is step up or step down? why?

Answer Posted / jitender kotwal

AT GENERATION STATION ALWAYS 11KV LINE FURTHER WE CAN STEP
UP TO REDUCE THE LOSSES IN TRANSMISSION AND ALSO TO REDUCE
THE SIZE OF THE CONDUCTOR

Is This Answer Correct ?    9 Yes 3 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

I HAVE A 50A MCCB AS PER DESIGN LINE WIRE CONNECT UPWORD SIDE AND LOAD IS CONNECTED TO DOWNWARD SIDE TO THE MCCB.IF NOW ANY ONE CHANGE SUPPLY & LOAD(WISEVERSA) WHAT HAPPENS ? DOES MCCB OPERATION OR WORKING FUNCTION NORMAL IF YES THAN WHY THERE ARE MARKED LINE & LOAD ON MCCB.

1931


what are the difference between AC lamp and DC lamp

1681


what is the role of energy meter in distribution system ?

676


How to calculate loses in transformer of 160 KVA ?

1235


List some examples of renewable energy?

782






Write down the name of 2 lady Bir Pratin of Bangladesh

1570


What is the diff. between single compression and double compression gland

1528


I am going to appear for the RRB Chennai Section Engineer online exam. Please send me the question papers from 2001 to date to my mail id:upendrakrishna20@gmail.com,plz send me ,or send any other rrb papers plzzzzzzzzzzzzzzzzzz

1640


which type of motor is used in automatic swing gate

1575


Name two low frequency oscillators?

909


what shall be no load voltage of 132/33 kV transformer ? is it 33 kv of 34.5 kV

1716


Use of switch mode power converter in real-time basis?

636


sir i am apearing for nic exam.i dont know exam pattern.can you please send me some model papers

1505


Draw a SLD for main panel for school having connected load of 1200kw and emergency generator 200kw.also show the increase of additional load of chiller 225kw in the lv panel indicating meter postion size of transformer ,cables and capacitor bank.

533


How does an induction motor start?

747