plz explain TSM and PSM.with example suppose ct ratio is
4000/5 and tsm is .15 and plug is at 3.75 if fault current
is 8000A.so how i find relay oprating time.
Answer Posted / yashpal
plug setting is = 3.75 means pick up= 3.75 A.Relay
operating time will depends on the charecteristic of relay.
(invese,normal inverse).if the fault current is 8000A then
current in the sec will be 10 A which is three times of
3.75A(connected plug setting),now just watch the relay
charteristic written on relay u can get the time required
for relay operation.(ex- for inverse charecteristic relay
for 3 time current & tms = 1 ,timing is 6.25 sec,so for
our problem timing will be 6.25 * 0.15=0.9375 sec.
| Is This Answer Correct ? | 16 Yes | 5 No |
Post New Answer View All Answers
What is meaning of out of phase (making & breaking) capacity And how to calculate
When will you multiply and devide with derating factors to the actual value while sizing the cable?
I want to calculate how much capacitor we connect to maintain the unity power factor? Is there any formula? Pls give me the answer
checking procedure of capacitor based motors.used in fans etc?
Can you explain about TEE protection scheme?
How to measure the earth resistance value in a concrete pavement(flood light area)?
what is the affect of earth's magnetic field on the frequency used in aircraft???
If UG power cable both ends are to be earthed or what? If not why?
Define peak overshoot.
what is the safty of poly phase tranformer?
Why control of DC motor is simpler?
What is the Surge suppresor? Why using in a UDB's and How it works?
in battery charging room we find two fuses (one in positive other in negative cables ).why it is so?one fuse is ore than sufficient?
HOW WORK HEAT PLATE EXCHANGER
Can any one know what are the symbols at the down (below) the analog ammeter??? there are 4 symbols which are they ?????