Answer Posted / sujatha
Hai
according to me
In V-Model testing starts with s/w dev it self
so while preparing the URS/BRS we can write the user
acceptance test cases
while preparing the SRS we can write the system test cases
while preparing the design we can write the integration
test cases
while preparing the coding we can write the unit test cases
| Is This Answer Correct ? | 1 Yes | 3 No |
Post New Answer View All Answers
Want to learn Manual Testing in just two days? Students around Thanjavur, Trichy, Mayavaram and Kumbakonam Mail to manualtestingtraning@gmail.com. Entire Manual Testing Concept. Any doubt regarding IT Job please mail above ID
what is the architecture of your current project?
IF ASCII_CODE_OF_ENTERED_CHAR is less than 44 THEN reject it ELSE IF ASCII_CODE_OF_ENTERED_CHAR is greater than 56 THEN reject it ELSE it's a digit, so accept it Which one of the following sets of ASCII codes do you use to test the sample code above WITHOUT redundant coverage?
Hi, Please can one tell me how to test the usability testing, which method has to be used, how to write the report? Thanks Deepa
write test cases on wall
What is a testing process / lifecycle?
approx how long a simple website take time just for manual testing including report generation.
how to test ecg machine?
What do we need to build a quality QC team ? a QC manager with all junior QCs or a QC manager with all senior QCs?
What is a bug triage?
When do we perform smoke testing?
How to do Performance Testing manually for a Flash Application?
1. what is a date guidelines ?
i want manual and automation test cases and interview questions
What is the difference between SIT AND IST?