Answer Posted / raghavndraaaaaaaaaaaaaaaaaaaaa
not getting
| Is This Answer Correct ? | 8 Yes | 4 No |
Post New Answer View All Answers
Is it necessary to apply tack coat over the primecoat. IF not what happens.answers other than 1.to superimpose the next layer(2) to adhere the layers so as to form homogenity.
What is the difference between undo & redo?
how can calculate cutting length of diamond ring
Does brick grows bigger every year?
how to create our resume?
why steel tanks are provided (a) for water pressure (b) for wind pressure (c) for earthquake pressure
Labor requirement for each item needed? Lean Concrete 103.550m3 Concrete for Foundation and Structure 1753.000m3 Expansion joint 288.000m Contraction joint 127.000m Dowel bar 450.000m
how do you calaculate the total steel quantity of an rcc building using thumb rule?
Can someone please be curing period of the following according to IS codes Column beam slab brick masonry raft found. and also tell how many hours/day
How much material is required for constructing a 2 Lane 2Km rigid pavement road
In how many types u can do POP on ceiling and walls(on which material or by using which material)? b) what is the difference between dry , oil bound, enamel, acrlyic type of painting?
how much cement and sand required for 100sqm of wall plastering in different proportions
while doing the structural works of a simple ground+1 villa, can the columns be continued immediately after neck columns without tie beam, while the tie beam to be done after columns concreting.
material required for construction of 1cu.mtr wall (Cement, No of bricks (Brick size 40cm x 20cm x 10cm),sand,Quantity of water
What are the advantages of cad?