Answer Posted / chethan
ups means uninnterrepted power supply , to main tain the
constant volage & to avaide shutdowning the system.
| Is This Answer Correct ? | 1 Yes | 6 No |
Post New Answer View All Answers
Why Water motor is not taking a load or pressure while everything is correct. (Note: Motor running properly)
What is Harmonics how it is produced and what is the method to control the same
Is it possible to obtain 480v or 550v in single phase output by giving the input to 230v to a single phase torodial type transformer without using a stepup transformer?
Hello sir, pls send me hpcl technical test papers .i am. Appearing for the exam.
Please clarify, 1. Is it required to lay two runs of GI wire along with Armoured LT cable if it is laid between one big mains (63Amps TPN SDF) to small main (32A TPN SDF) with proper glanding termination? 2. If the armoured cable with proper glanding is laid from DB to CNC machine, is it required to run two runs of body earthing to the Machine from DB? 3.If the armoured cable with proper glanding is laid from Substation to Hangar, distance is approx. 100 mtrs, is it required to do earthing at shop area though the primary termination at substation is earthed through gland.
If one lamp connects between two phases it will glow or not?
A Question Like A Wire Is Wound Whose Resistance Is Some 132. 44647 Ohms. If A Voltage Of 30 mv, 296 Ma Current Is Applied To It What Is The Resistance.
what is the standard values(Megger test) of resistances between L&N,L&E and N&E for a system on IEE regulations?
An ISP is granted a block of addresses starting with 150.80.0.0/16. The ISP wants to distribute these blocks to 2600 customers as follows. a) 200 medium size businesses; each needs 16 addresses b) 400 small businesses; each needs 8 addresses c) 2000 households; each needs 4 addresses Design the subblocks and give the slash notation for each subblock. Find out how many addresses are still available after these allocations.
working principle of oil startar
Why MCCB is Getting tripped sometimes when there is no load in the Midnight ?
What is Bolted fault?
i have 90kw motor.so i choose connect cable .please what is parameter checked so please give to formula
What are conduct on the testing in cf in ur site?
How to decide whether A / B / C / D curve type MCB should be used?