What is the Total Power generation Capacity in India at
present ??
Answer Posted / varma
as of 12/2008
grand total installed capacity:1,47,402.81MW.
thermal power:93,392.64MW.
HYDRO POWER:36,647.76MW
NUCLEAR POWER:4,120MW
RENEABLE POWER(SOLAR/WIND)IS 13,242.41MW
Is This Answer Correct ? | 29 Yes | 14 No |
Post New Answer View All Answers
please forward me the type of questions which would rise while me attending to 33KV Electrical License to my mail ID:vadrevu_raghava@yahoo.co.in
What is negative sequence over voltage element?
1- What is the Polarization Index number be good for 15KV 3c#500MCM electrical cable? 2- Can I use the IEEE Std 43-2000 to perfom the PI test? Thanks
what is invertor supply and raw powersupply
being an electrical engineer why you wanna come into software i have an very good academics what answer i have to give
How does an induction motor start?
Cables Construction hi friends, 0.6/1/1.2 kV LV , DC and Control cables are concentric copper conductor what does its means and what is the use of concentric copper conductor,and are this with copper tape shield or copper screening, ? thanks
what is relation between ct and pt ratio with multiplication factor of a energy meter? is there any other factor on which multification factor depend?
what is the standard values(Megger test) of resistances between L&N,L&E and N&E for a system on IEE regulations?
What is the safety of UPS?
WE know that for Inductor X=2pifL,In DC f=0,then X=0 so,V=IX=0;But In the DC excitation of rotor of AC generator,DC motor field coil which coils are inductor so why does not applying DC voltage short the rotor coil of AC generator and field coil of motor?If it would then DC source might be damaged but it is not happened. Why does the strand conductor of Electrical power transmission line make twist?
please explain how to do 'pole drop test' on generator?
what is the requirement regarding earthing of Single conductor with AWA
control & auxilary circuits used for circuir breakers
A commercial Building is designed with 14th floor levels with indoor substation of three phase transformer with rated capacity of 1000 Kva.The transformer delivered 65% of its rated capacity at 0.67 power factor lagging.Because of low power factor, the power customer was penalized and certain cost was charged accordingly based on every point percentage lower than 85%.This situation may repeatedly happen on the succeding energy bills of power customer.The power customer is desired to improve its historical power factor of 0.67 lagging and no further penalty be impose by the local power company on the next bill. Q: Identify the appropriate solution you want to offer to Client?.Justify SCIENTIFICALLY and MATHEMATICALLY the principles behind the solution.