what is different between installation and commonissonig.
Answer Posted / kanth
installation means equipment keep in a right place in a
right manner without damage(ex
pannels,motors,pipeline,whatever it is)
and in commissioning we have to start the equipment and
give to the coustmer without any damage,it include risk and
troubleshooting
Is This Answer Correct ? | 7 Yes | 1 No |
Post New Answer View All Answers
Both generator parallel condition shared load equally but one genrator taking ampere more than the other what are all the causes to make like this
a)In a 3-phase 4-wire circuit, a circuit breaker is selected to protect the circuit whose highest fault level is 6.6 MVA. Determine the required minimum breaking capacity in kA. (Note: Covert 3-phase power in terms of kA to find answer.) b)Using the below, determine the required minimum making capacity in kA as a “peak value”. Rate breaking capacity (Icn) ka: Icn<= 1.5 Factor = 1.41 1.5
What Normal(Tangent) towers and Tension(Cut-point) Towers?
How is the speed of a DC shunt motor related to the armature current?
I have done my m.tech in electrical engg discipline. Can any one please suggest me how should I prepare for getting into phd in iit or nit.How should I prepare for getting into lecturership
Why does curving the pole faces in a dc machine contributes to a smoother dc output voltage from it?
Hello sir, pls send me hpcl technical test papers .i am. Appearing for the exam.
what is metering cum synchronizing panel and how it is used?
Why there are some equipment(i.e:TV) that using 2-pin plug instead of three? What happen if there is current leakage? Are we going to get electric shock??
What is meant by Im=30mA@Vk/2. How to know the kee point voltage for CT design
what is differentila pilot supervision in the incomer control panel in the power station?
Y phase plates are used in transmission line??? what is there need???
what is the grounding Calculation formula? spouse i want to provide grounding to 3phase 18kw motor or i want to provide ground to 3phase 10kva dry type transformere or you give me any exemple...... Thanks.
After synchronization with grid what is the demand value QKVAR and how we will maintain that?
How many VSC based HVDC are there in India and the world