WHAT ARE THE STEP BY STEP PROCESS TO APPLY JAVA PATCHES
through JSPM ON SAP R/3 SYSTEM?
Answer Posted / muruga
Steps for Patching JAVA Stack
Once the required patches files are downloaded from Service
Market place,then move all the patches files to global EPS
inbox directory /usr/sap/trans/EPS/in.
Step 1: Start the JSPM tool from
\usr\sap\CTM\DVEBMGS00\j2ee\JSPM\go.bat .It will prompt for
the JSPM password.
Step 2: Choose the Deployment tab.JSPM guides you through
the process of applying a support package stack via a
wizard, which consists of the following five options:
1.Select Package Type 2.Specify Queue 3.Check Queue 4.Deploy
Queue and 5.Completed.
Step 3: Select Support Package Stack type(option button).
Support package Stack, Single Support Package etc..
NWDI controls:(option button)
If your system is not used for NWDI development, select No
NWDI. And If your system is used for NWDI development,
select the role of your system by selecting one of the
following: DEV, CONS, TEST, or PROD.
Step 4:Choose Next.
Support package stacks that are available for deployment
from the global EPS inbox directory are displayed in the screen.
Step 5:Click on Next button
JSPM starts the deployment of the software components that
are part of the selected support package stack. The status
of all software components changes to SCHEDULED.
Note: If the support package stack includes a kernel
upgrade, and if your system is distributed, during the
deployment you will be first prompted to stop the central
services instance and any running dialog instances, and to
choose Next. You will be then prompted to start the central
services instance and to choose Next.
Step 6: The deployment of the components of the support
package stack can finish with the one of the following status:
*DEPLOYED
*DEPLOYED WITH WARNING
*ERROR
*NOT DEPLOYED
If the support package stack includes the JSPM, when it has
been updated, for the update to take effect, you will be
prompted to restart it. If there are still components in
status NOT DEPLOYED, JSPM will proceed with their deployment
when you start it again.
Bear in mind that you must not change the content of the
global EPS inbox directory before the deployment has finished.
Step 7: Click Next
If the deployment of the support package stack has finished
with status DEPLOYED, you can choose New Deployment or Exit
Completed
Is This Answer Correct ? | 32 Yes | 1 No |
Post New Answer View All Answers
How should I set priority for Printing say like user, teamlead, project manager?
What will happen during the export process?
What is the different architecture between SAP 4.7EE & ECC5.0
If brtools is not working how you will add datafile?
Explain segment?
What is GRIR, GRIR effect, why it is imp, How it is analysed, What is expected out GRIR, What is auto write off & Manual GRIR write off?
what are the current support stack levels at market place?
What is the difference between developer trace, system log and system trace?
what is the common storage file for oracle ?
I am installing a sap j2ee engine at crm. When it reaches phase 22 it halts for more than 10 minutes and gives up starting the system. What should I do?
How to identify a particular T_Code has been modified or not? If yes, how to identify who modified particular T_Code in current system?
What is the use of profile paramater ztta/roll_area?
please share sap basis admin interview questions .. thanks sadik
Have you done any parameter changes using configtool and visual admin tool?
What is the database backup strategy in your company?