Answer Posted / sundhu
Use of Pegged Requiremets:
You can use the Pegged requirements function to retrace
from any BOM level
1) which requirements are the source of which procurement
proposals
2) which independent requirements (especially sales orders)
are affected if a procurement proposal is cancelled or a
date or quantity is changed on a lower level.
| Is This Answer Correct ? | 7 Yes | 1 No |
Post New Answer View All Answers
How to attach a drawing for a material to bom ? Is it possible ?
Integration between PP and MM Module.
How you get the ticket?
List out the activities carried out in production planning?
Explain what is sap pp?
What is MRP group?
What are gaps? Some examples?
We need to do gi of components to production order using back-flush. The component stock is managed in batches. The batch to be back-flushed?
What parameters you maintain in “plant parameters” in configuration?
Define mrp controller
Integration between PP and SD module.
Difference between Item categories or what is variable size item or non stock item.
What is alternative BOM, or diff between BOM group and Group BOM?
Explain Flexible planning Procedure?
What are the three 'mrp procedures'?