Answer Posted / sundhu
Use of Pegged Requiremets:
You can use the Pegged requirements function to retrace
from any BOM level
1) which requirements are the source of which procurement
proposals
2) which independent requirements (especially sales orders)
are affected if a procurement proposal is cancelled or a
date or quantity is changed on a lower level.
| Is This Answer Correct ? | 7 Yes | 1 No |
Post New Answer View All Answers
How to create object dependencies in a bom for a configurable material?
How to create PRT master record?
Why the work scheduling view is required for semi-finished and finished products?
What is "work center" in sap pp and what is the use of data in work centers?
We want to report on several status combinations like each order that has status ‘not deleted’ and ‘not technically completed’. What set up is required?
Difference between byproduct and co-product.
Checkdigit example
What are basic dates?
What is MRP Area or How can I excluede one storage location stock from MRP?
List out the basic procedure for dispatching operations in capacity leveling?
How many levels of Flexible Planning are there?
define variable cost
In project the customization is comes under which phase?
What is the difference between pp and pp-pi? Which one is better and how ?
What is costing? How it is affected the pp?