Answer Posted / sundhu
Use of Pegged Requiremets:
You can use the Pegged requirements function to retrace
from any BOM level
1) which requirements are the source of which procurement
proposals
2) which independent requirements (especially sales orders)
are affected if a procurement proposal is cancelled or a
date or quantity is changed on a lower level.
| Is This Answer Correct ? | 7 Yes | 1 No |
Post New Answer View All Answers
What are all the settings done for configuring the integration of pp with fico?
How is the processing time calculated in a wc when both labor, machine categories exist?
In sap-pp what are the costing parameters?
What is the use of mrp list?
Explain Availability check.
How are time management and payroll are integrated?
What is planned consumption and unplanned consumption?
Difference between Routing, Ref op set, Rate routing and Ref rate routing.
What are some important tables used in pp (production planning)?
Define mrp controller
Explain how ‘pp’ is ‘integrated’ with other modules?
Tell one biggest task for you
suppose we have sales order-40, PIR-25,warehouse stock-40, so when we run mrp,what quantity the system displays with MTO & MTS. How?
Define mrp list
Difference between PP and PI.