my scenario is repetitive manufacturing (REM) make-to-stock
(MTS)production for sugar industry. What are the things, I
have to customize for this scenario, to the PP point of
view..
Answer Posted / sundhu
Hi,
To customize this first need to maintain the Master data,
1) Material Master-> MRP4-> create & add Producion version,
2) Define the BOM-> CS01.
3) Create a Rate Routing->CA21.
And in Transaction data,
1) Create a Planned independent Requirements->MD61,
2) Run MRP->MD02,
3) Review the capacity through Planning Table->MF50,
4) Finally can create the Product Cost Collector->KKF6N.
Note:
KKF6N is a integration between PP & FICO.
Is This Answer Correct ? | 7 Yes | 2 No |
Post New Answer View All Answers
Integration between PP and SD module.
What is routing in sap pp?
If u maintain sub-contacting where and how will be reflect
Can we use the same routine for materials undergoing the same process/operations? Can we avoid separate routing for each and every material produced?
What is a ‘routing’ in pp?
What is the use of stock requirement list?
Mention what is the use of t-code cs20 in bom?
List out the activities carried out in production planning?
Difference between Routing, Ref op set, Rate routing and Ref rate routing.
We want to report on several status combinations like each order that has the status ‘not deleted’ and ‘not technically completed’. What set up is required?
what is the major ticket in your experience
What is internal payroll process?
Explain In-process inspection.
Where have we to specify the teardown time in one operation?
What do we do in the realization phase?