Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

We have 2 no. 4MW DG set. and GEB supply.
But, we running, only 1 DG set. when we done APFC/Power
factor setting : 0.90, then winding temp. Low. but when
setting done : 0.83, then Winding temp. increase.
WHY Why ? ? ?, plz give me answer.

Answer Posted / gurucharan singh

this is clear that at lower pf settings, its the DG which
compensate for the KVAR. which results in the high winding
temperature. For this check the plant loads connected. And
KVAR supplied by EB & DG. Also during parallel with grid DG
generally act as KVAR compensator along with KW supplied.

Is This Answer Correct ?    2 Yes 1 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

How to calculate the Harmonics losses in terms of cost/unit.

2077


What is the BS(British Standard)code for 11kv motor

5049


When color of silica gel will gets change from blue to pink from Top to bottom?

1644


List few applications of d.c series motor?

1175


What is meant by bus bar protection?

1257


How we can calculate the consumption in kwh of motor on basis of kw @100% load, @50% load & @ no load.

2837


What are your personal skills and abilities for such a Master Course and your possible preparation to undertake this course?

2083


Name a govt approved university which have 100% online engineering course.

1750


Single line diagrams for star to delta and DOL starters.

2307


What are the Return ( Monthly / quarterly/ Annual submitted to Electical Inspector for an establishment (Factory in Maharashtra-- Small scale category having seperate HT line of 22KV ) as per Maharashtra Electricity Act

2080


wat is the first thing dat is needed, 2 lay a cable in some area??

1915


how to store the thunder power?

4571


why ten delta testing is carried out on power transformer

1859


What is the loss of power of transformer 220kv/33kv,63/80mva of % imp12.05 at 80%load

1886


what is the difference between 4pole & 6pole DC Motors & give advantage ?

1943