Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

why we used bricks in brickbat coba? main roll of bricks ?
how it function?

Answer Posted / suresh

brickbat is mostly uesd in coba floring becouse brick bat
observar miosture and keep surface clean and dry

Is This Answer Correct ?    10 Yes 13 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

What is the value of live load that should be incorporated in design of locker room and cash vault room while designing a building for commercial bank?

2779


how calculate the bearing from two coordinates?

2311


material used for mendrel use to bend epoxy coated rebar

2225


I am a civil engineer . I am also selected for sbi clerk interview which is to be held on 4th May2010 is there anybody resembling the same? what question can be asked and what should be the probable answers?

2481


What is a projection line?

1233


may i know the detailed description of cutting length

2101


Why should you show Client/Engineer activities clearly on the project plan?

2458


4. Differentiate between NC and OC soils. Draw curves for (i) Stress vs Strain (ii) Volume charge vs Strain (iii) Pore pressure vs Strain for these soils

2888


the volume of cement req for 70cum of brickwork in 1:6 cement mortar is approx is equal to 3cum 5cum 7cum 1ocum

2098


I want some common questions which have been asked in interviews of NTPC Limited,Satluj Jal Vidyut Nigam Ltd.,and Bharat Heavy Electricals Ltd.

2319


in a building why we are using T beams? why can i adopt beam bottom & Top level as same as slab bottom & Top level?

2372


.5Ast

1848


Please tell me Detail cost of providing& laying nominal mix design 1:2.5:5,40mm nominal size.curing complete e/c cost of form work in foundation and plinth i/c carriage.

2294


For a washout valve why are two gate valves required in normal practice?

1189


What is Rankine Cycle?

1145