As an engineer, what u should do when the construction of a
building doesn't meet the required specifications?
Answer Posted / saravanan
If the specififcations not satisfied, to dismantled the
poor quality areas and the repair work has been done for
that area which will be appropriate for the construction.
Is This Answer Correct ? | 1 Yes | 0 No |
Post New Answer View All Answers
In the present situation of ban on mining sand from rivers,can we go for formation of earth dam filters viz;Horizantal sand blanket,inclined chimney and filters under rivetment with crushed rock sand of 6mm down size.If so what are the specifications and is there any codal provision for its authentication?
How many axes do cartesian coordinate system has?
How much sand and cement requirement for 1 SQM 125mm thickness Brickwork
why steel tanks are provided (a) for water pressure (b) for wind pressure (c) for earthquake pressure
need to join coaching institute in coimbatore tamilnadu ......say me the best coaching for IAS
how to clculate the %of concrete strenght achive after curing?load
what is the relation between pitch of steel and depth of slab?
what is the weight of 6000 psi concrete in lb/cft?
Why M15 is replaced by M20 when ammendment are made in IS456 in 2000?
for Precast foundation howmany days required we can shift the foundation with american Standards i need reference with section any body can help
What is the software used in civil engineering?
If 40 backlogs are cleared m finally with 65 percent marks . Am I eligible to get visa to US
I Want To Know Quantity of Cement Conc. & Sand in Column of 9"x9"x10'
Hi all, please guide me about the volume. And percentage. Of steel fibre to be used. My project. Is Sifcon.
In a concrete grade C35A, C & A stands for what and equalent cube strength?