WHAT IS THE DIFFERENCE BETWEEN PLC AND DCS
Answer Posted / palak majmudar
1) PLC can not handle complicated loops and can not give
accurate result of close loops, it is only useful for very
simple application loops; while DCS can handle very complex
cascade loops and give very accurate controls to process
equipment using some inbuilt or predefined algorithms in
programming.
2) PLC has limitation in expansion of closed loops; While
DCS can handle no. of closed loops without any interruption.
3) PLC is useful for very small plant application; while
DCS is useful for integration of small-small plant and to
bring those all on a single platform.
| Is This Answer Correct ? | 17 Yes | 4 No |
Post New Answer View All Answers
Why the ammonia and Nitric Acid level indicators is with millimeter ? and What is the conversion form millimeters that level indicator indicate to weight ?
can we copy the software from a transmitter using hht(hart 275) ?
I have a Control VAlve having size of 2 ".Only the known parameter is Pressure drop . Its 2 Kg. Then How to calculate control valve sizing means Cv.
A PLC is programmed to drive three motors A, B and C as follows : After running motor A for an hour, motor B should get ON and motor A should get OFF. And after running motor B for an hour, motor C should get ON and motor B should get OFF. And after running motor C for an hour, motor A should get ON and motor C should get OFF. (That is, a cyclic repetition with time period one hour) Now, the second condition is: If any motor gone faulty and is tripped, the consecutive motor should get ON and the faulty (tripped) motor should be eliminated from cyclic repetition. The remaining two motors should bear the cyclic repetition of one hour each. (For healthy motor take logic as high and for tripped motor take logic as low) Now, the third condition is: When motor A load(Amps) exceeds 60% of its rated load, motor B should get ON in parallel to motor A. And when both motors A & B are running in parallel, and if their load exceeds 60% of their rated load, motor C should also start in parallel to A & B. [Here the cyclic repetition is eliminated, until their loads become normal(40%)] [Take logic high(1) for load at 60% and logic low(0) for load at 40%] Now draw a flow chart or a ladder diagram to fulfill the above condition.
In turbine what does term CDP, NH, HSSOC means.
this site is owned by an nonsense
what is SIL 1 2 3
what is the advantage of submersible level transmitter compare to ultrasonic level transmitter?
What is the use of control cable?
How flow can be measured with dp?
䑰ҕ䔈ҕ䖠ҕ䘰ҕ䛀ҕ䝐ҕ䟐ҕ䢐ҕ䥐ҕŹ
how many pulses are required by a ac induction servo motor of 4 poles with 50 Hz frequency to rotate by 1 degree?
How to calibrate capillary type level transmitter
i want to find out iffco get test paper
Q- Control problem are mainly classified in _____ types. a-)4 b-)3 c-)6 d-)nono of these Few of them i know is 1- regulator type problem (eg- Air conditioner) 2- tracking problem (eg missile trcking problem) 3- sybernatics 4- optimal control problem