how much % of steel use in footing, slab, column
Answer Posted / rajesh bende
Slabs:- 0.7 to 1.0%
Columns:- 1.0 to 5.0%
Raft, Footing, Columns: - 0.5 to .8%
| Is This Answer Correct ? | 80 Yes | 71 No |
Post New Answer View All Answers
why we use aggregate,sand with cement in concrete?
What are the strongest shapes in building?
Bitumen grades are 30-40,60-70, 80-100. what is mean by 30- 40
how to calculate weight of 1.8 cum of aggregate
What is the difference between Rock And Murrum. How to claim that excavated material is not a murrum but rock.
what is a well
how to reduce size of column 450 x 750 to 230 x.... if it is cut in area of bathroom? means it appears in bathroon any shifting or any other option....building is g + 10 and the bathroom is at first floor...
what does the grad of cement shows (denotes)?
PL.tell me about civil engineering questions with answer
which steel is better for residential building tmt steel or hysd steel
Time required for curing of wall tiles before fixing
For sloping slabs or sloping beams why the tension steel from either side of ridge is taken into compression zone of other side?
how much quantity of cement,sand and water required for 1 sq feet flooring work .
questions with answers to face an interview of an civil engineer regarding RCC buidings
how to compute slab reinforcements on step by step procedures??